Software Engineering
Plan a Software Architecture Decision
A recorded architecture decision that compares options against explicit constraints, records consequences, and assigns a verification checkpoint before implementation.
The process
Work it in this order.
- State the decision, context, affected users, architecturally significant requirements, time horizon, and who can approve the choice.
- Collect the relevant product, repository, reliability, security, cost, and compliance constraints, separating verified facts from assumptions and unknowns.
- Define at least two viable options plus doing nothing, then compare them against explicit criteria instead of selecting by familiarity.
- Stress-test each option for failure modes, migration effort, operational burden, reversibility, security exposure, and long-term change cost.
- Choose a recommendation or record a deliberate deferral, with rationale, dissent, rejected alternatives, and the conditions that would change the decision.
- Write the decision record with status, context, decision, consequences, evidence links, owners, and review triggers before implementation begins.
- Review the record with accountable owners, record approval or required conditions, and return the artifact, evidence, and unresolved risks to the requester.
Bring this
Inputs the cat will ask for.
- architecture decision and decision owner
- requirements and constraints
- current system and revision
- available evidence and review stakeholders
Router + one playbook
Route first. Choose one.
Cat Paw loads one playbook per task rather than merging several. Start with this router; the remaining paths are workflow-specific candidates it can inspect.
- Router:
software-delivery-pack skills/software-delivery-pack/software-architecture-decision-gate/SKILL.md
Guardrails
The boundaries travel with the prompt.
- Verify the actual tools, accounts, permissions, and workspace before starting; never claim an unavailable tool, account, source, or capability.
- Use Latch/target-workspace for private code, artifacts, live probes, or non-public data; if that access is unavailable, stop at the boundary and report the blocker rather than substituting a guess.
- Pause for explicit approval before consequential external actions; return evidence and unresolved risks, assumptions, and any action still awaiting approval.
Done means
A checkable finish.
An approved or explicitly deferred architecture decision record contains the context, options, rationale, consequences, owners, evidence, and review triggers.